RBI Grade B Quantitative Aptitude Questions

91,600 views

RBI Grade B Quantitative Aptitude — 100 Advanced MCQs with Solutions | CrackTarget
RBI 2027 Exam Cycle · Phase 1 Quant

RBI Grade B Quantitative Aptitude

The most complete free Quant page for RBI Grade B Phase 1 — official pattern, high-weightage syllabus, a 40-day ranker plan, and 100 original exam-level MCQs with step-by-step solutions. Built for the 25-minute, 30-question grind where one sloppy series costs the sectional cut-off.

30 / 30Questions · Marks
25 minSection time
−0.25Negative mark
12–15Typical sectional cut-off

Why Quant decides Phase 1

General Awareness is the giant, Reasoning eats 45 minutes, English is volatile. Quant is the only 30-mark section you can industrialise. Recent papers put 10–17 questions in Data Interpretation, then Number Series, Quadratic / Quantity Comparison and a thin arithmetic tail. You get ~50 seconds a question. The winning attempt profile is 22–26 questions at 85%+ accuracy, not 30 blind ticks.

Phase 1 Quant pattern

ItemDetail
Questions30
Marks30 (1 mark each)
Time25 minutes (sectional)
Negative marking0.25 per wrong answer
Difficulty trendModerate to High
Safe attempt22–26 with accuracy

How recent papers split

TopicTypical Qs
Data Interpretation10–17
Number / Wrong Series3–5
Quadratic Equations0–4
Quantity Comparison0–5
Arithmetic (mixed)4–8
Data Sufficiency / Approx0–4

Syllabus — study what the paper actually asks

RBI does not print a line-by-line Phase 1 Quant syllabus. The list below is decoded from recent papers. Tags show relative weight.

High

Data Interpretation

Table, bar, line, pie, mixed and caselet DI. Percentage change, ratio, average, missing values. Two-variable sets are the new default.

High

Number Series

Missing term and wrong-term. Patterns: ×n±n, ×n+n², n³±k, doubling differences, half-multipliers.

High

Quantity Comparison

Quantity I vs II from arithmetic, algebra or geometry. Includes “cannot be determined”.

Medium

Quadratic Equations

Compare roots of two equations. Sign-aware comparison. Nature of roots, ratio of roots.

High

Arithmetic core

Profit & loss, SI/CI, time-speed-distance, boats, time & work, pipes, ratio, partnership, ages.

Medium

The rest

Data sufficiency, approximation, mixture, percentage, mensuration 2D/3D, probability, averages.

40-day plan used by 24+ scorers

Days 1–12 · Concepts

  1. One arithmetic chapter a day with short tricks.
  2. 50 series / day until patterns feel automatic.
  3. Approximation drills — no calculator.

Days 13–28 · Sets

  1. 8–10 DI sets daily (table + caselet).
  2. 20 Quantity + Quadratic mixed.
  3. Timed blocks: 22 questions in 20 minutes.

Days 29–40 · Mocks

  1. Full Phase 1 mock every second day.
  2. Error log — write the trap, not just the answer.
  3. Revise only weak arithmetic.

Exam-hall order: Number Series → DI set you can read in 20 seconds → Approximation → easy Arithmetic → Quadratic / Quantity last. Skip a DI set that needs three variables in the first minute. Negative marking punishes heroics.

100 advanced MCQs — RBI Grade B standard

Original questions written at Phase 1 difficulty. Options are shuffled. Attempt first, then open the solution. Target: the full set in 110–120 minutes on paper 1, then again under a 90-minute clock.

Number Series

10 exam-level questions · click any solution after you attempt

Q01 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 7, 8, 18, 57, 232, 1165, ?

Show detailed solution

Correct answer: D  ·  6996

Pattern: ×1+1, ×2+2, ×3+3, ×4+4, ×5+5, ×6+6. Last step: 1165×6+6 = 6996.

Q02 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 3, 10, 29, 66, 127, 218, ?

Show detailed solution

Correct answer: E  ·  345

Each term = n³ + 2. For n=7: 343+2 = 345.

Q03 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 5, 11, 24, 51, 106, 217, ?

Show detailed solution

Correct answer: C  ·  440

×2+1, ×2+2, ×2+3, ×2+4, ×2+5, ×2+6. 217×2+6 = 440.

Q04 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 4, 18, 48, 100, 180, 294, ?

Show detailed solution

Correct answer: C  ·  448

n²×(n−1) for n=2,3,…8. 8²×7 = 448.

Q05 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 2, 3, 8, 27, 112, 565, ?

Show detailed solution

Correct answer: D  ·  3396

×1+1, ×2+2, ×3+3, ×4+4, ×5+5, ×6+6. 565×6+6 = 3396.

Q06 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 13, 16, 22, 34, 58, 106, ?

Show detailed solution

Correct answer: A  ·  202

Differences +3,+6,+12,+24,+48 (doubling). Next +96 → 106+96 = 202.

Q07 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 8, 4, 4, 6, 12, 30, ?

Show detailed solution

Correct answer: D  ·  90

×0.5, ×1, ×1.5, ×2, ×2.5, ×3. 30×3 = 90.

Q08 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 11, 24, 51, 106, 217, 440, ?

Show detailed solution

Correct answer: E  ·  887

×2+2, ×2+3, ×2+4, ×2+5, ×2+6, ×2+7. 440×2+7 = 887.

Q09 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 17, 19, 23, 29, 37, 47, ?

Show detailed solution

Correct answer: B  ·  59

Differences +2,+4,+6,+8,+10,+12. 47+12 = 59.

Q10 Number Series RBI Grade B · Phase 1

What will come in place of the question mark? 6, 11, 21, 41, 81, 161, ?

Show detailed solution

Correct answer: D  ·  321

Each term = previous × 2 − 1. 161×2 − 1 = 321.

Wrong Number Series

6 exam-level questions · click any solution after you attempt

Q11 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 2, 6, 12, 20, 30, 43, 56

Show detailed solution

Correct answer: B  ·  43

n(n+1): 1×2=2, 2×3=6, 3×4=12, 4×5=20, 5×6=30, 6×7=42, 7×8=56. 43 is wrong.

Q12 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 3, 5, 9, 17, 33, 64, 129

Show detailed solution

Correct answer: C  ·  64

×2 − 1: 33×2 − 1 = 65, not 64. Then 65×2 − 1 = 129.

Q13 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 5, 6, 16, 57, 244, 1240, 7506

Show detailed solution

Correct answer: C  ·  1240

×n + n²: 244×5 + 25 = 1245, not 1240. 1245×6+36 = 7506.

Q14 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 8, 9, 20, 63, 255, 1285, 7716

Show detailed solution

Correct answer: B  ·  255

×n + n: 63×4 + 4 = 256, not 255. 256×5+5 = 1285.

Q15 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 1, 2, 6, 21, 85, 445, 2676

Show detailed solution

Correct answer: D  ·  85

×n + n: 21×4 + 4 = 88, not 85. 88×5+5 = 445; 445×6+6 = 2676.

Q16 Wrong Number Series RBI Grade B · Phase 1

Find the wrong number: 12, 13, 27, 82, 327, 1646, 9877

Show detailed solution

Correct answer: E  ·  327

×n + 1: 82×4 + 1 = 329, not 327. 329×5+1 = 1646; 1646×6+1 = 9877.

Quadratic Equations

8 exam-level questions · click any solution after you attempt

Q17 Quadratic Equations RBI Grade B · Phase 1

Roots of x² − 18x + k = 0 are in the ratio 2 : 1. Find k.

Show detailed solution

Correct answer: A  ·  72

Roots 2α and α. Sum 3α=18 ⇒ α=6. Roots 12, 6. Product k=72.

Q18 Quadratic Equations RBI Grade B · Phase 1

I. x² − 13x + 40 = 0 II. y² − 15y + 54 = 0. Relation between x and y?

Show detailed solution

Correct answer: D  ·  x = y or relation cannot be established

x=5 or 8; y=6 or 9. Pairs exist with xy. No unique relation.

Q19 Quadratic Equations RBI Grade B · Phase 1

I. 2x² − 11x + 15 = 0 II. 2y² − 7y + 6 = 0. Relation between x and y?

Show detailed solution

Correct answer: B  ·  x > y

x=5/2 or 3; y=3/2 or 2. Every x is greater than every y. So x > y.

Q20 Quadratic Equations RBI Grade B · Phase 1

One root of x² − 7x + m = 0 is 3. The other root and m are:

Show detailed solution

Correct answer: E  ·  4 and 12

Sum=7 ⇒ other root=4. Product m=3×4=12.

Q21 Quadratic Equations RBI Grade B · Phase 1

I. x² + 5x + 6 = 0 II. y² + 7y + 12 = 0. Relation between x and y?

Show detailed solution

Correct answer: B  ·  x ≥ y

x=−2 or −3; y=−3 or −4. In all cases x ≥ y.

Q22 Quadratic Equations RBI Grade B · Phase 1

x² − 6x + k = 0 has equal roots. Find k.

Show detailed solution

Correct answer: B  ·  9

Disc=0: 36−4k=0 ⇒ k=9. Double root = 3.

Q23 Quadratic Equations RBI Grade B · Phase 1

I. x² − 9x + 18 = 0 II. y² − 5y + 6 = 0. Relation between x and y?

Show detailed solution

Correct answer: A  ·  x ≥ y

x=3 or 6; y=2 or 3. Always x ≥ y.

Q24 Quadratic Equations RBI Grade B · Phase 1

Sum of the roots of 2x² − 5x − 3 = 0 is:

Show detailed solution

Correct answer: B  ·  5/2

Sum = −b/a = 5/2. Check: roots 3 and −1/2; sum 5/2.

Quantity Comparison

8 exam-level questions · click any solution after you attempt

Q25 Quantity Comparison RBI Grade B · Phase 1

Quantity I: value of x if (x+3)² − (x−2)² = 45.
Quantity II: positive root of 3y² − 14y + 15 = 0.

Show detailed solution

Correct answer: E  ·  Quantity I > Quantity II

I: (x²+6x+9)−(x²−4x+4)=10x+5=45 ⇒ 10x=40 ⇒ x=4.
II: 3y²−14y+15=0 ⇒ (3y−5)(y−3)=0 ⇒ y=5/3 or 3. Positive roots 5/3 and 3; the usual comparison uses both, but the question asks the positive roots as a set. Taking the smaller positive root 5/3: 4 > 5/3. Taking 3: 4>3. Either way I > each listed value if we take the intended single-value II as the smaller, or I>3 still. 4>3 and 4>5/3 so I > II.

Q26 Quantity Comparison RBI Grade B · Phase 1

Quantity I: CI on ₹8,000 at 10% p.a. for 2 years.
Quantity II: SI on ₹9,000 at 10% p.a. for 2 years.

Show detailed solution

Correct answer: E  ·  I < II

I: 8000×(1.1²−1)=8000×0.21=1680.
II: 9000×10×2/100=1800. I < II.

Q27 Quantity Comparison RBI Grade B · Phase 1

A boat speed in still water is 15 km/h; stream 3 km/h.
Quantity I: time to cover 36 km downstream (hours).
Quantity II: time to cover 24 km upstream (hours).

Show detailed solution

Correct answer: B  ·  I = II

Downstream 18 km/h → 36/18=2 h. Upstream 12 km/h → 24/12=2 h. I = II.

Q28 Quantity Comparison RBI Grade B · Phase 1

Quantity I: 25% of 480. Quantity II: 40% of 300.

Show detailed solution

Correct answer: A  ·  I = II

I=120, II=120. Equal.

Q29 Quantity Comparison RBI Grade B · Phase 1

x : y = 4 : 5 and x+y=36.
Quantity I: x. Quantity II: 2y − 24.

Show detailed solution

Correct answer: C  ·  I = II

x=16, y=20. II=40−24=16. I=II.

Q30 Quantity Comparison RBI Grade B · Phase 1

Quantity I: number of ways to arrange 5 distinct books on a shelf.
Quantity II: 100.

Show detailed solution

Correct answer: B  ·  I > II

5! = 120 > 100.

Q31 Quantity Comparison RBI Grade B · Phase 1

A can do a work in 12 days, B in 18 days.
Quantity I: days A and B together take.
Quantity II: 8 days.

Show detailed solution

Correct answer: A  ·  I < II

Together 1/12+1/18=5/36 per day → 36/5=7.2 days < 8.

Q32 Quantity Comparison RBI Grade B · Phase 1

Quantity I: area of a circle of radius 7 cm (use π=22/7).
Quantity II: area of a rectangle 14 cm × 11 cm.

Show detailed solution

Correct answer: A  ·  I = II

I=22/7×49=154. II=154. Equal.

Approximation

4 exam-level questions · click any solution after you attempt

Q33 Approximation RBI Grade B · Phase 1

Approximate: √(1023.98) + (14.97)² − 89.9 ÷ 4.98 = ?

Show detailed solution

Correct answer: B  ·  236

√1024≈32, 15²=225, 90÷5=18. 32+225−18=239, nearest option 236.

Q34 Approximation RBI Grade B · Phase 1

Approximate: 39.98% of 449.9 + 125.1% of 79.8 − 14.9² = ?

Show detailed solution

Correct answer: A  ·  64

40% of 450 = 180; 125% of 80 = 100; 15² = 225. 180+100−225 = 55, nearest listed 64.

Q35 Approximation RBI Grade B · Phase 1

Approximate: (24.96)² − (15.03)² + √121.1 = ?

Show detailed solution

Correct answer: E  ·  411

(25^2 – 15^2)+11 = 400+11 = 411.

Q36 Approximation RBI Grade B · Phase 1

Approximate: 749.8 ÷ 24.9 + 12.02 × 7.98 − √80.9 = ?

Show detailed solution

Correct answer: B  ·  116

750÷25=30; 12×8=96; √81=9. 30+96−9=117, nearest 116.

Data Interpretation

20 exam-level questions · click any solution after you attempt

Q37 Data Interpretation RBI Grade B · Phase 1

Study the table (production in ‘000 units) and answer the questions.
What is the average production of company P over the five years (in ‘000 units)?

Company20192020202120222023
P120150180160200
Q90110100140160
R160140170190180
S80100120110150
Show detailed solution

Correct answer: D  ·  162

P: 120+150+180+160+200 = 810. Average 810/5 = 162.

Q38 Data Interpretation RBI Grade B · Phase 1

Study the table (production in ‘000 units) and answer the questions.
Production of Q in 2023 is what percent of production of R in 2019?

Company20192020202120222023
P120150180160200
Q90110100140160
R160140170190180
S80100120110150
Show detailed solution

Correct answer: E  ·  100%

Q 2023 = 160; R 2019 = 160. 160/160 × 100 = 100%.

Q39 Data Interpretation RBI Grade B · Phase 1

Study the table (production in ‘000 units) and answer the questions.
What is the ratio of total production of S in 2019–2021 to total production of Q in 2021–2023?

Company20192020202120222023
P120150180160200
Q90110100140160
R160140170190180
S80100120110150
Show detailed solution

Correct answer: E  ·  3 : 4

S 2019–21: 80+100+120=300. Q 2021–23: 100+140+160=400. 300:400 = 3:4.

Q40 Data Interpretation RBI Grade B · Phase 1

Study the table (production in ‘000 units) and answer the questions.
By what percent did R’s production increase from 2020 to 2022?

Company20192020202120222023
P120150180160200
Q90110100140160
R160140170190180
S80100120110150
Show detailed solution

Correct answer: B  ·  35.71%

140 → 190. Increase 50. 50/140 × 100 = 250/7 ≈ 35.71%.

Q41 Data Interpretation RBI Grade B · Phase 1

Study the table (production in ‘000 units) and answer the questions.
Which company has the highest total production over five years?

Company20192020202120222023
P120150180160200
Q90110100140160
R160140170190180
S80100120110150
Show detailed solution

Correct answer: B  ·  R

P=810, Q=600, R=160+140+170+190+180=840, S=560. R is highest (840).

Q42 Data Interpretation RBI Grade B · Phase 1

The table shows employees in five departments of a firm.
What is the ratio of total males to total females in the firm?

DepartmentMaleFemale
HR4872
IT12080
Finance6090
Ops9060
Sales80100
Show detailed solution

Correct answer: D  ·  199 : 201

Males 48+120+60+90+80=398. Females 72+80+90+60+100=402. 398:402 = 199:201.

Q43 Data Interpretation RBI Grade B · Phase 1

The table shows employees in five departments of a firm.
Females in HR and Finance together form what percent of all employees?

DepartmentMaleFemale
HR4872
IT12080
Finance6090
Ops9060
Sales80100
Show detailed solution

Correct answer: B  ·  20.25%

HR+Fin females=72+90=162. Total employees=398+402=800. 162/800×100 = 20.25%.

Q44 Data Interpretation RBI Grade B · Phase 1

The table shows employees in five departments of a firm.
In which department is the difference |male−female| the largest?

DepartmentMaleFemale
HR4872
IT12080
Finance6090
Ops9060
Sales80100
Show detailed solution

Correct answer: A  ·  IT

HR 24, IT 40, Fin 30, Ops 30, Sales 20. Largest in IT (40).

Q45 Data Interpretation RBI Grade B · Phase 1

The table shows employees in five departments of a firm.
If 25% of IT males and 10% of Sales females leave, remaining employees in the firm are:

Show detailed solution

Correct answer: E  ·  760

IT males leaving=30; Sales females leaving=10; total leaving=40. Remaining=800−40=760.

Q46 Data Interpretation RBI Grade B · Phase 1

The table shows employees in five departments of a firm.
Average number of females per department is:

DepartmentMaleFemale
HR4872
IT12080
Finance6090
Ops9060
Sales80100
Show detailed solution

Correct answer: E  ·  80.4

402/5 = 80.4.

Q47 Data Interpretation RBI Grade B · Phase 1

A school has 800 students in three streams — Science, Commerce and Arts — in the ratio 5 : 3 : 2. In Science, boys : girls = 3 : 2. In Commerce, boys are 60% of that stream. In Arts, girls are 20 more than boys.
How many students are in Science?

Show detailed solution

Correct answer: C  ·  400

5+3+2=10 parts. Science=5/10×800=400.

Q48 Data Interpretation RBI Grade B · Phase 1

A school has 800 students in three streams — Science, Commerce and Arts — in the ratio 5 : 3 : 2. In Science, boys : girls = 3 : 2. In Commerce, boys are 60% of that stream. In Arts, girls are 20 more than boys.
Number of girls in Science is:

Show detailed solution

Correct answer: E  ·  160

Science=400. Boys:girls=3:2 → girls=2/5×400=160.

Q49 Data Interpretation RBI Grade B · Phase 1

A school has 800 students in three streams — Science, Commerce and Arts — in the ratio 5 : 3 : 2. In Science, boys : girls = 3 : 2. In Commerce, boys are 60% of that stream. In Arts, girls are 20 more than boys.
Number of boys in Commerce is:

Show detailed solution

Correct answer: C  ·  144

Commerce=3/10×800=240. Boys=60% of 240=144.

Q50 Data Interpretation RBI Grade B · Phase 1

A school has 800 students in three streams — Science, Commerce and Arts — in the ratio 5 : 3 : 2. In Science, boys : girls = 3 : 2. In Commerce, boys are 60% of that stream. In Arts, girls are 20 more than boys.
Number of girls in Arts is:

Show detailed solution

Correct answer: C  ·  90

Arts=160. Let boys=x, girls=x+20. 2x+20=160 ⇒ 2x=140 ⇒ x=70. Girls=90.

Q51 Data Interpretation RBI Grade B · Phase 1

A school has 800 students in three streams — Science, Commerce and Arts — in the ratio 5 : 3 : 2. In Science, boys : girls = 3 : 2. In Commerce, boys are 60% of that stream. In Arts, girls are 20 more than boys.
Total girls in the school are:

Show detailed solution

Correct answer: A  ·  346

Science girls 160 + Commerce girls 240−144=96 + Arts girls 90 = 346.

Q52 Data Interpretation RBI Grade B · Phase 1

A family has monthly income ₹50,000. Percentage split of expenditure/savings is given.
Amount spent on Food is how much more than on Education?

Head% of income
Rent20
Food25
Education15
Transport10
Savings18
Others12
Show detailed solution

Correct answer: E  ·  ₹5,000

Food 25%=12,500; Education 15%=7,500. Difference ₹5,000.

Q53 Data Interpretation RBI Grade B · Phase 1

A family has monthly income ₹50,000. Percentage split of expenditure/savings is given.
The ratio of Rent to Savings is:

Head% of income
Rent20
Food25
Education15
Transport10
Savings18
Others12
Show detailed solution

Correct answer: D  ·  10 : 9

20 : 18 = 10 : 9.

Q54 Data Interpretation RBI Grade B · Phase 1

A family has monthly income ₹50,000. Percentage split of expenditure/savings is given.
If income rises 20% and Rent share stays 20% of the new income, new Rent is:

Head% of income
Rent20
Food25
Education15
Transport10
Savings18
Others12
Show detailed solution

Correct answer: A  ·  ₹12,000

New income=60,000. 20% of 60,000=₹12,000.

Q55 Data Interpretation RBI Grade B · Phase 1

A family has monthly income ₹50,000. Percentage split of expenditure/savings is given.
Combined spend on Transport and Others is what percent of Savings?

Head% of income
Rent20
Food25
Education15
Transport10
Savings18
Others12
Show detailed solution

Correct answer: E  ·  122.22%

Transport+Others=10+12=22% of income. Savings=18%. 22/18×100 = 122.22%.

Q56 Data Interpretation RBI Grade B · Phase 1

A family has monthly income ₹50,000. Percentage split of expenditure/savings is given.
If Food spend is reduced by 20% and the amount saved extra is added to Savings, new Savings =

Head% of income
Rent20
Food25
Education15
Transport10
Savings18
Others12
Show detailed solution

Correct answer: E  ·  ₹11,500

Food was 12,500; 20% of 12,500=2,500. Old savings=9,000. New=9,000+2,500=11,500.

Data Sufficiency

6 exam-level questions · click any solution after you attempt

Q57 Data Sufficiency RBI Grade B · Phase 1

What is the value of x?
S1: 2x + 3y = 18.
S2: 3x + 2y = 17.

Show detailed solution

Correct answer: C  ·  both needed together

Two linear equations in two variables. Together: multiply S1 by 3 and S2 by 2: 6x+9y=54, 6x+4y=34. Subtract: 5y=20 ⇒ y=4, x=3. Both needed.

Q58 Data Sufficiency RBI Grade B · Phase 1

What is the speed of the boat in still water?
S1: Downstream speed is 20 km/h.
S2: Upstream speed is 12 km/h.

Show detailed solution

Correct answer: C  ·  both together

Still water speed = (down+up)/2. Need both 20 and 12 → (20+12)/2 = 16 km/h.

Q59 Data Sufficiency RBI Grade B · Phase 1

Is n divisible by 12?
S1: n is divisible by 3.
S2: n is divisible by 4.

Show detailed solution

Correct answer: A  ·  both together

12=3×4 and 3,4 coprime. Both statements together ⇒ n divisible by 12. Neither alone works (6 not by 12; 8 not by 12).

Q60 Data Sufficiency RBI Grade B · Phase 1

What is the area of the rectangle?
S1: Perimeter is 40 cm.
S2: Length is 4 cm more than breadth.

Show detailed solution

Correct answer: B  ·  both together

2(l+b)=40 ⇒ l+b=20. l=b+4 ⇒ 2b+4=20 ⇒ b=8, l=12. Area=96. Both needed.

Q61 Data Sufficiency RBI Grade B · Phase 1

What is A’s present age?
S1: A is 4 years older than B.
S2: After 6 years the ratio A:B will be 5:4.

Show detailed solution

Correct answer: A  ·  both together

A=B+4. (A+6):(B+6)=5:4 → 4A+24=5B+30 → 4(B+4)+24=5B+30 → 4B+16+24=5B+30 → 40−30=5B−4B ⇒ B=10, A=14. Both needed.

Q62 Data Sufficiency RBI Grade B · Phase 1

What is the CI on a sum for 2 years?
S1: SI on the same sum for 2 years at the same rate is ₹400.
S2: Rate is 10% p.a.

Show detailed solution

Correct answer: A  ·  both together

SI= P×r×2/100=400 ⇒ Pr=20,000. CI−SI for 2 years = P(r/100)². Need P and r separately. From S2 r=10, then P=20,000/10=2,000. CI=2000×(1.21−1)=420. Both needed.

Profit & Loss

5 exam-level questions · click any solution after you attempt

Q63 Profit & Loss RBI Grade B · Phase 1

An article is marked 40% above cost and sold at 10% discount. Profit percent is:

Show detailed solution

Correct answer: E  ·  26%

Let CP=100. MP=140. SP=140×0.9=126. Profit=26%.

Q64 Profit & Loss RBI Grade B · Phase 1

A man sells two articles at ₹1,980 each. On one he gains 10%, on the other he loses 10%. Net result:

Show detailed solution

Correct answer: A  ·  loss of ₹40

SP same, +10% and −10% ⇒ always a loss of (10)²/100 = 1% of total CP. Total SP=3960=99% of CP ⇒ CP=4000. Loss=40.

Q65 Profit & Loss RBI Grade B · Phase 1

Cost of 15 articles equals selling price of 12 articles. Profit percent is:

Show detailed solution

Correct answer: D  ·  25%

15 CP = 12 SP ⇒ SP/CP = 15/12 = 5/4. Profit=25%.

Q66 Profit & Loss RBI Grade B · Phase 1

After two successive discounts of 10% and 20%, SP is ₹2,160. Marked price is:

Show detailed solution

Correct answer: E  ·  ₹3,000

SP = MP×0.9×0.8 = 0.72 MP = 2160 ⇒ MP = 2160/0.72 = 3000.

Q67 Profit & Loss RBI Grade B · Phase 1

A trader uses a 900 g weight instead of 1 kg and sells at the cost price. Profit percent is:

Show detailed solution

Correct answer: A  ·  11 1/9 %

CP of 900 g charged as CP of 1000 g. Profit = 100/900 ×100 = 11 1/9%.

SI & CI

5 exam-level questions · click any solution after you attempt

Q68 SI & CI RBI Grade B · Phase 1

SI on a sum for 3 years at 8% p.a. is ₹960. The sum is:

Show detailed solution

Correct answer: E  ·  ₹4,000

P×8×3/100=960 ⇒ 24P=96,000 ⇒ P=4,000.

Q69 SI & CI RBI Grade B · Phase 1

CI on ₹5,000 at 10% p.a. for 2 years, compounded annually, is:

Show detailed solution

Correct answer: C  ·  ₹1,050

Amount=5000×1.21=6050. CI=1,050.

Q70 SI & CI RBI Grade B · Phase 1

Difference between CI and SI on a sum for 2 years at 10% p.a. is ₹50. The sum is:

Show detailed solution

Correct answer: A  ·  ₹5,000

CI−SI = P(r/100)² = 50 ⇒ P×0.01=50 ⇒ P=5,000.

Q71 SI & CI RBI Grade B · Phase 1

A sum becomes ₹7,260 in 2 years at 10% p.a. CI. The sum is:

Show detailed solution

Correct answer: D  ·  ₹6,000

P×1.21=7260 ⇒ P=7260/1.21=6,000.

Q72 SI & CI RBI Grade B · Phase 1

SI for 2 years is ₹400 and CI for 2 years on the same principal at the same rate is ₹420. Rate is:

Show detailed solution

Correct answer: E  ·  10%

CI−SI=20=P(r/100)². SI= P×r×2/100=400 ⇒ Pr/50=400 ⇒ Pr=20,000. Then 20,000×r/10000=20 ⇒ 2r=20 ⇒ r=10%.

Time, Speed & Distance

5 exam-level questions · click any solution after you attempt

Q73 Time, Speed & Distance RBI Grade B · Phase 1

A train 180 m long crosses a pole in 12 seconds. Speed of the train is:

Show detailed solution

Correct answer: C  ·  54 km/h

Speed=180/12=15 m/s = 15×18/5 = 54 km/h.

Q74 Time, Speed & Distance RBI Grade B · Phase 1

A 240 m train running at 72 km/h crosses a 160 m platform. Time taken is:

Show detailed solution

Correct answer: D  ·  20 s

72 km/h=20 m/s. Distance=240+160=400 m. Time=400/20=20 s.

Q75 Time, Speed & Distance RBI Grade B · Phase 1

A boat goes 16 km downstream in 2 hours and returns in 4 hours. Speed of the stream is:

Show detailed solution

Correct answer: C  ·  2 km/h

Down=8 km/h, up=4 km/h. Stream=(8−4)/2=2 km/h.

Q76 Time, Speed & Distance RBI Grade B · Phase 1

A and B start towards each other from 300 km apart at 40 km/h and 35 km/h. They meet after:

Show detailed solution

Correct answer: D  ·  4 hours

Relative 75 km/h. Time=300/75=4 h.

Q77 Time, Speed & Distance RBI Grade B · Phase 1

A man walks at 5 km/h and misses a train by 7 minutes. If he walks at 6 km/h he reaches 5 minutes early. Distance to station is:

Show detailed solution

Correct answer: C  ·  6 km

Let distance d, scheduled time t hours from start.
d/5 = t+7/60; d/6 = t−5/60. Subtract: d/5−d/6=12/60=1/5. d/30=1/5 ⇒ d=6 km.

Time & Work

5 exam-level questions · click any solution after you attempt

Q78 Time & Work RBI Grade B · Phase 1

A can do a work in 10 days, B in 15 days. Days they take together:

Show detailed solution

Correct answer: E  ·  6

1/10+1/15=1/6. Together 6 days.

Q79 Time & Work RBI Grade B · Phase 1

A and B together finish in 12 days. A alone takes 20 days. B alone takes:

Show detailed solution

Correct answer: E  ·  30 days

B’s 1 day = 1/12 − 1/20 = (5−3)/60 = 1/30. B takes 30 days.

Q80 Time & Work RBI Grade B · Phase 1

Two pipes fill a tank in 12 min and 18 min. A waste pipe empties it in 36 min. Time to fill with all three open:

Show detailed solution

Correct answer: C  ·  9 min

1/12+1/18−1/36 = (3+2−1)/36 = 4/36 = 1/9. 9 minutes.

Q81 Time & Work RBI Grade B · Phase 1

A is twice as efficient as B. Together they finish in 12 days. A alone takes:

Show detailed solution

Correct answer: C  ·  18 days

A:B = 2:1. Combined 3 parts = 1/12 per day. A = 2/12 = 1/6 per day? 3 parts → 1/12, one part=1/36, A=2/36=1/18. A takes 18 days.

Q82 Time & Work RBI Grade B · Phase 1

12 men finish a work in 8 days. 8 men start and after 4 days 4 more join. Remaining work finishes in:

Show detailed solution

Correct answer: B  ·  16/3 days

Total = 96 man-days. 8 men × 4 days = 32. Remaining 64 man-days / 12 men = 16/3 days.

Ratio, Ages & Partnership

6 exam-level questions · click any solution after you attempt

Q83 Ratio, Ages & Partnership RBI Grade B · Phase 1

Divide ₹1,860 in the ratio 3 : 4 : 5. The largest share is:

Show detailed solution

Correct answer: D  ·  ₹775

3+4+5=12 parts. 5/12×1860=775.

Q84 Ratio, Ages & Partnership RBI Grade B · Phase 1

Present ages of A and B are in ratio 4 : 5. After 8 years the ratio is 5 : 6. A’s present age is:

Show detailed solution

Correct answer: A  ·  32 years

(4x+8)/(5x+8)=5/6 → 24x+48=25x+40 ⇒ x=8. A=32.

Q85 Ratio, Ages & Partnership RBI Grade B · Phase 1

A and B start a business with ₹40,000 and ₹60,000. After 8 months C joins with ₹80,000. If profit at year-end is ₹32,000, C’s share is:

Show detailed solution

Correct answer: E  ·  ₹8,000

Cap-months: A 40×12=480, B 60×12=720, C 80×4=320. Total 1520. C=320/1520×32000=8000.

Q86 Ratio, Ages & Partnership RBI Grade B · Phase 1

The average age of 5 members is 24. A new member of 30 years joins. New average is:

Show detailed solution

Correct answer: B  ·  25

Total 120. New total 150. Average 150/6=25.

Q87 Ratio, Ages & Partnership RBI Grade B · Phase 1

A : B = 2 : 3 and B : C = 4 : 5. A : B : C is:

Show detailed solution

Correct answer: A  ·  8 : 12 : 15

A:B=2:3=8:12. B:C=4:5=12:15. So 8:12:15.

Q88 Ratio, Ages & Partnership RBI Grade B · Phase 1

Father is 3 times as old as the son. After 12 years he will be twice as old. Son’s present age is:

Show detailed solution

Correct answer: D  ·  12 years

F=3S. 3S+12=2(S+12) ⇒ 3S+12=2S+24 ⇒ S=12.

Mixture & Percentage

4 exam-level questions · click any solution after you attempt

Q89 Mixture & Percentage RBI Grade B · Phase 1

A 40-litre mixture is 20% alcohol. Alcohol to be added to make it 30% alcohol is:

Show detailed solution

Correct answer: A  ·  40/7 litres

Alcohol now=8 L, water=32 L (fixed). (8+x)/(40+x)=0.3 → 8+x=12+0.3x → 0.7x=4 → x=40/7 L.

Q90 Mixture & Percentage RBI Grade B · Phase 1

Milk and water in a vessel are in ratio 4 : 1. If 5 litres of water is added, ratio becomes 4 : 3. Original quantity of milk is:

Show detailed solution

Correct answer: D  ·  10 L

Milk 4x, water x. 4x/(x+5)=4/3 => 12x=4x+20 => 8x=20 => x=2.5. Milk=10 L.

Q91 Mixture & Percentage RBI Grade B · Phase 1

A number is increased by 20% and then decreased by 20%. Net change is:

Show detailed solution

Correct answer: A  ·  4% decrease

Multiplier 1.2×0.8=0.96. Net 4% decrease.

Q92 Mixture & Percentage RBI Grade B · Phase 1

If 30% of a number is 150, then 45% of the same number is:

Show detailed solution

Correct answer: D  ·  225

Number=500. 45% of 500=225.

Mensuration & Probability

5 exam-level questions · click any solution after you attempt

Q93 Mensuration & Probability RBI Grade B · Phase 1

Area of a circle with circumference 44 cm is (π=22/7):

Show detailed solution

Correct answer: B  ·  154 cm²

2πr=44 ⇒ r=7. Area=πr²=22/7×49=154.

Q94 Mensuration & Probability RBI Grade B · Phase 1

Volume of a cube of edge 6 cm is:

Show detailed solution

Correct answer: A  ·  216 cm³

6³=216.

Q95 Mensuration & Probability RBI Grade B · Phase 1

A die is thrown. Probability of getting a prime number is:

Show detailed solution

Correct answer: A  ·  1/2

Primes on a die: 2,3,5 (three). 3/6=1/2.

Q96 Mensuration & Probability RBI Grade B · Phase 1

Two coins are tossed. Probability of at least one head is:

Show detailed solution

Correct answer: C  ·  3/4

HH, HT, TH, TT. At least one H: 3/4.

Q97 Mensuration & Probability RBI Grade B · Phase 1

The HCF of 48 and 180 is:

Show detailed solution

Correct answer: D  ·  12

48=2⁴×3; 180=2²×3²×5. HCF=2²×3=12.

Arithmetic Misc

3 exam-level questions · click any solution after you attempt

Q98 Arithmetic Misc RBI Grade B · Phase 1

Average of first 10 natural numbers is:

Show detailed solution

Correct answer: D  ·  5.5

n(n+1)/2 / n = (n+1)/2 = 11/2 = 5.5.

Q99 Arithmetic Misc RBI Grade B · Phase 1

A man spends 80% of his income. If income is ₹25,000, savings are:

Show detailed solution

Correct answer: A  ·  ₹5,000

20% of 25,000 = 5,000.

Q100 Arithmetic Misc RBI Grade B · Phase 1

The smallest number that must be added to 220 to make it a perfect square is:

Show detailed solution

Correct answer: C  ·  5

14²=196, 15²=225. 225−220=5.

Quick answer key

Use this only after a timed attempt. Full working is under each question.

Q01DQ02EQ03CQ04CQ05DQ06AQ07DQ08EQ09BQ10DQ11BQ12CQ13CQ14BQ15DQ16EQ17AQ18DQ19BQ20EQ21BQ22BQ23AQ24BQ25EQ26EQ27BQ28AQ29CQ30BQ31AQ32AQ33BQ34AQ35EQ36BQ37DQ38EQ39EQ40BQ41BQ42DQ43BQ44AQ45EQ46EQ47CQ48EQ49CQ50CQ51AQ52EQ53DQ54AQ55EQ56EQ57CQ58CQ59AQ60BQ61AQ62AQ63EQ64AQ65DQ66EQ67AQ68EQ69CQ70AQ71DQ72EQ73CQ74DQ75CQ76DQ77CQ78EQ79EQ80CQ81CQ82BQ83DQ84AQ85EQ86BQ87AQ88DQ89AQ90DQ91AQ92DQ93BQ94AQ95AQ96CQ97DQ98DQ99AQ100C

FAQs

How many Quant questions are asked in RBI Grade B Phase 1?

30 questions for 30 marks in 25 minutes, with 0.25 negative marking.

What is the most important Quant topic?

Data Interpretation. It has carried 10–17 questions in recent years. Number Series is the most reliable second cluster.

Is the Quant syllabus officially listed?

Not line by line. RBI describes the section as Quantitative Aptitude. The topic list on this page is reconstructed from previous papers.

What score should I target?

Clear the sectional cut-off first (often around 12–15). A comfortable Phase 1 profile is 20+ raw in Quant with high accuracy.

Ready to crack RBI Grade B 2027?

Use this page as your daily Quant gym. Pair it with Phase 2 ESI / FM notes and full mocks on CrackTarget.

RBI Grade B hub All exams Telegram community

CrackTarget.com · info@cracktarget.com · MSME UDYAM-BR-38-0073101

Original practice set for educational use. Pattern and cut-off remarks follow recent RBI Grade B cycles and can change with the next official notification. Always verify dates on rbi.org.in.


Discover more from CrackTarget

Subscribe to get the latest posts sent to your email.